# Session 0032.0 — Transcript > App: vscode-cowriting-plugin > Start: 2026-06-12T01-20 (PST) > End: 2026-06-12T03-05 (PST) > Type: planning-and-executing > Posture: autonomous (yolo) > Status: **FINALIZED** ## Launch prompt "What's next?" → operator chose: **tidy loose ends, then plan-and-execute #31**. Then "keep going" → continued into #34, then #33. ## Pre-state On `main`, but the baseline was not clean: local `main` behind `origin/main` by 3 (session-transcript commits — this app keeps `sessions/` in the code repo), an untracked `specs/` dir, an abandoned worktree `pedantic-brahmagupta-472309` (106 commits behind), and two merged-but-undeleted remote branches. Memory pointed to plan-and-execute #31 next. ## Arc ### 1. Loose-ends tidy - Fast-forwarded `main`; synced the 0032 claim. - F10 spec `coauthoring-interactive-review.md` was missing from the content repo — placed it in the content repo **working tree** (left uncommitted; that repo has operator-owned capture drafts + a diff-view.md edit pending the operator's publish). - Removed the stray code-repo `specs/` (one dup of content, one now-placed). - Removed the abandoned worktree (untracked `prototype/` + `.claude/` snapshotted to `~/.wgl/abandoned-worktree-snapshots/pedantic-brahmagupta-472309/`). - Deleted the two merged remote branches. - **Correction:** the "0024 unfinalized" loose end carried in prior memory is FALSE — 0024 has a finalized transcript. Dropped from memory. ### 2. #31 — inline-at-anchor proposals (PR #36, merged; issue closed) TDD. `renderReview` now associates each resolved proposal with the current-side block its `anchorStart` falls in and emits the `cw-proposal` block right after that block; same-block order by anchorStart then id; unresolved/unplaceable still trail (INV-33/34). Implements the placement the F10 spec §2/§6.2 already specified (the #29 trailing-block was a recorded v1 deferral). +5 unit tests, +1 E2E in-place assertion. One pre-existing F7 E2E flake (fixed-timeout `settle()` race) passed on re-run — unrelated to the change (different code path). ### 3. #34 — delete F6 dead two-pane view (PR #37, merged; issue closed) Removed the dead `vscode.diff` VIEW: `DiffViewController.toggle`/`findDiffTab`/ `epochLabel`/`isDiffOpen`, the `cowriting-baseline:` content provider + `BASELINE_SCHEME` + `baselineUri` + content-provider emitter, the `toggleDiffView` command + `ctrl+alt+d` keybinding. Kept the baseline DATA layer fully intact (ensureBaseline/advance/pin/capture, getBaseline, onDidChangeBaseline, persistence INV-19, machine-landing advance INV-18). Rewrote the diffView E2E suite to the baseline-data-layer tests; flipped F10 + no-workspace assertions to "toggleDiffView absent." ### 4. #33 — intra-emphasis sentinel hardening (characterized, DEFERRED) Reproduced two failure modes with the real renderer (recorded as issue #33 comment). Operator chose to defer to its own session. No code changed. ## Cut state `main` clean and synced; 0 open PRs. #31 + #34 shipped and closed. 194 unit + 49 E2E green; typecheck + build clean. No deploy pipeline (VS Code extension, no flotilla/PPE). ## Deferred decisions 1. **Kept `pinDiffBaseline` in #34 against the issue's literal acceptance.** Alternative: remove it as the issue listed. Why: the canonical Solution Design (spec §6.7) scopes the removal to the two-pane VIEW only ("keep the controller + baseline store"); `pin()` is a §6.4 baseline-lifecycle op, never touches `vscode.diff`, and is exercised by live F7 baseline-reset tests. Spec wins over the P3 capture draft (documentation-leads-automation). Logged for operator awareness. 2. **F10 spec left UNCOMMITTED in the content repo working tree** rather than committed/pushed. Alternative: push it. Why: the content repo has operator-owned pending work (capture issue-drafts + a diff-view.md edit); content publishing is the Author's gesture (per wgl-capture). Surfaced to the operator. 3. **Discarded the abandoned worktree's untracked files** (prototype/index.html + .claude config). Snapshot-and-proceed: copied to `~/.wgl/abandoned-worktree-snapshots/` before `git worktree remove --force`. ## Next /goal ``` /goal plan-and-execute #33 (intra-emphasis sentinel hardening) via the token-aware HTML-post-process approach recommended in the issue #33 comment, per specs/coauthoring-interactive-review.md §1.7/§9 ``` (Alternatives in the backlog: #32 scroll-sync needs a Solution Design first (brainstorming); #35 repo rename is an outward admin gesture awaiting operator timing.)