Files
rfc-app/backend/app
Ben Stull 1dab24eef0 Merge feat/multi-project (§22 M1+M2) into main
Integrates the multi-project work so far — the §22 design drafts, M1 (the
schema spine), and M2 (project-scoped authorization + the §22.7 resolver) —
on top of the v0.32.0 retire/§13 changes that landed on main meanwhile.

Integration decisions:
- Renumbered the M1 projects migration 025_projects.sql -> 026_projects.sql.
  v0.32.0 shipped 025_retired_state.sql, which rebuilds cached_rfcs and
  predates the project_id column; running projects *after* the retire rebuild
  is required so project_id survives on a fresh database (the runner applies
  *.sql in filename order). Comment/doc references bumped to match.
- Resolved the get_rfc conflict in api.py by composing both gates: compute the
  viewer once, apply the §22.5 visibility gate, then v0.32.0's §13.7
  retired-entry owner-only check.
- api_graduation.py / api_discussion.py auto-merged cleanly (M2's threaded
  viewer/visibility gate coexists with the new retire endpoints + retired
  state).

Full suite 401 passed on a fresh DB.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-03 04:56:39 -07:00
..